There will be a construction project on our campus from March 30th to May 10th. The concrete wall located along our driveway is going to be replaced with a new wood fence. Overall, the project will have limited impact on our day to day operations. However, it will affect our drop-off routine.
During the construction project the driveway along the soccer field will be reduced down to one lane. In order to decrease congestion in the morning and afternoon we are only going to allow school buses to use the driveway. Students that are transported to and from school in a personal vehicle will need to be dropped off in the parking lot on the far side of the soccer field. We will open the gate on the field next to the parking lot to allow students and parents to transition to and from the parking lot to the school. The sidewalk on the outside of the field will also be open and available to use.
We will have staff in the parking lot to assist with the drop off process that normally happens in front of the school. We have attached a map that identifies the drop off location and the direction of travel we would like everyone to follow in the parking lot during the morning drop off. If you have any questions about the change in drop off procedures, please do not hesitate to call. We apologize in advance for any inconvenience.
Sincerely,



Justin O’Connor


KIS 서울캠퍼스 학부모님께

KIS건물과 수도전기공업고등학교 사이에 설치된 벽돌담이 노후가 많이 진행되어 안전을 위해 철거후 나무 펜스를 설치하려고 합니다.

교육환경 개선공사는 아래와 같이 진행 됩니다.
◉ 공 사 명 : 교육환경 개선공사 ( 담장 철거 및 신규 설치 )
◉ 공사기간 : 2017년 3월 30일 ~ 2017년 5월 10일

아침에 개인차량을 이용하시는 학부모님들은 주차장내 운동장 입구에서 학생들이 하차하도록 지도하여 주시기 바랍니다. 버스 이용 학생들은 기존과 같이 건물 입구에서 탑승 및 하차를 합니다.
건물로 진입하는 도로의 혼잡을 방지하고자, 공사기간 동안 운동장 옆 진입 도로를 통제합니다.

학생들의 교육환경과 학부모님들의 불편을 최소화하기 위해 안전하고 신속하게 공사가 진행되도록 최선을 다하겠습니다.